Ruling on supply supposed to have been completed cannot be given AAR
M/s Aryan Contractor Pvt Ltd. Is providing work contract service to Main contractor for providing services in relation to work order of Main Contractor who has taken contract from State Govt. and main contractor charged GST @ 12%. Scope of work include clearing & grubbing of existing ground removal of stumps and removal of unsuitable black cotton soil to the required depth and its disposal, earth work excavation, construction of embankment and also responsible for deployment of manpower, their safety and compliance to statutory obligation. Mining/ Quarrying stone quarry of NMSCFW at Aurangabad, Maharashtra State and operation of the stone crusher for production of stone aggregate for GSB and stone aggregate thought VSL. Further trimming of the side slips of hillock and ground surface to the required level as per the FRL to the surface of Top of sub-grade and further disposal of overburden, stone boulder to a designated place.
Applicant provides service of contractor for supply of labour, worker, employee, Material, Machinery and other staff for mining activity, carrying production in crushing unit and operation of crushing plants for manufacturing of finished product for Nagpur-Mumbai Expressway package-09 from 390.445 to 448.845 in Aurangabad.
Blasting Mining/Quarrying Site is some time away from the actual work allotted to main contractor for Highway Development. Applicant agreed to provide such services for supply for labour, Material and machinery and machinery etc leading to production of finished product for a tentative quantity. The contractor shall provide its services at the plant and quarry owned by MEIL as per the terms and conditions.
Applicant’s Scope of Work are as under:-
- Hard rock quarrying by drilling and Blasting Activities at mine site.
- Loading, transporting and unloading of blasted rock.
- Transportation of blasted material from quarry area to plant area.
- Curing —Sizing of rock in blasting plant as per the specification given by MEIL.
- Operation of crusher including HSD, Lubricants & oils and any other equipment that are required, staff workers and electricity charges.
- Produce adequate insurance policies to meet all the risk and liabilities during the operation of quarry and crusher, its operators, driver’s workers employees and other staff developed at mining, operation of plants.
- Produce adequate required for drilling & blasting, loading, Transportation of spoils to hoper and crushing operation.
- Bear cost/ Charges of diesel, consumables and spares to the D.G set (Diesel/electricity generating set installed by MEIL at crusher plants.
- Provide canteen/ Boarding/travelling and any other expenses to staff.
- Do the mining with the location showed by MEIL as per the road profile b/w mentioned chainage.
Applicant is providing works contract service to main contractor providing services in relation to work order of Main contractor who had taker? contract from State Government and Main Contractor Charged @ 12% to Government.
Observation of the court
Court has perused the documents on records and considered the submissions made by the applicant. The jurisdictional officer has not made any submissions in the said matter in-spite of having been directed, during the course of the hearings, to file written submissions.
Applicant has submitted that they provide service of contractor for supply of labour, worker, employee, Material, Machinery and other staff for mining activity, carrying production in crushing unit and operation of crushing plants for manufacturing of finished product for Nagpur-Mumbai expressway in Aurangabad and shall provide their services at the plant and quarry owned by Megha Engineering & Infrastructures Limited (MEIL) as per the terms and conditions.
The applicant has submitted WORK ORDER No. MEIL/3134/NME-P9/W.O./Excavation- Filing /2018-19/02 dated 31.10.2018 as a relevant document in support of its impugned activity.
- Court has perused the copy of the said agreement dated 31.10.2018 and observe as under:
- As per clause 10.2 of the said Work Order dated 31.10.2018, the effective date of the fined Work Order shall commence from 31.10.2018 and such commencement date of Execution of Works shall be reckoned as the effective date.
- Clause 10.1 of the said Work Order dated 31.10.2018 states that : “The Contractor (applicant) has thoroughly understood the scope of work and shall complete the works by 31.12.2019 as directed by the Project Manager of MEIL. However, the Contractor shall endeavor to complete the works within the shortest possible time keeping in view of the project requirements”.
- As per clause 16.4 of the said Work Order, “Any delay beyond contractual completion date (mentioned in the work order) shall be liable to be levied Liquidated damages for delay or for shortfall in performance or progress or achieving the said targets.
From the above it is seen that the due date for completion of the impugned contract is 31.12.2019 and in case of delay, Liquidated Damages to be levied on the applicant.
The applicant has not brought anything on record to show that they have not completed the impugned works on or before 31.12.2019 which is a part of the subject Work Order. Further a reading of the clause 10.1 mentioned above, reveals that the date 37_12.2019 appears to be important in this case, in as much as, the applicant is required to perform the works as per the contract on or before 31.12.2019. In fact, the said clause clearly mentions that the Contractor shall endeavor to complete the works within the shortest possible time. Thus, there appears to be no scope for extension in the subject Work Order, after 31.12.2019.
Further, the copy of two Tax Invoices submitted by the applicant, are pertaining to Work Order No MEIL/MSRDC/-P28/SOB-CONTRACT/2017-18/WO-1357 which is not the same as the impugned Work Order Number which is MEIL/3134/NME P9/W.0./Excavation-Filing/2018-19/02.
In view of the above, court finds that while the impugned contract was stipulated to end on 31.12.2019, the subject application in respect of the said contract has been filed only on 28.12.2020 i.e approximately one year after the impugned work/activity/supply was scheduled to be completed and was completed because nothing has been brought on record by the applicant to show that there was any extension of time granted to it after 31.12.2019 by MEIL to prove that the impugned activity was not completed.
Court therefore refers to Section 95 of the CGST Act, 2017. and reproduce the relevant provisions as under:- this Chapter, unless the context otherwise requires,— advance ruling” means a decision provided by the Authority or the Appellate Authority to an applicant on matters or on questions specified in sub-section (2) of section 97 or sub-section (1) of section 100, in relation to the supply of goods or services or both being undertaken or proposed to be undertaken by the applicant
The above underlined words are very clear. The questions for obtaining an Advance Ruling can be asked by a supplier of goods or services or both, only in relation to the supply being undertaken or proposed to be undertaken and not in relation to any supply of goods or services or both which has already been undertaken and completed before.
Since provisions of Sec 95 (a) are very clear and unambiguous that a supplier can file application for advance ruling only in relation to the supply being undertaken or proposed to be undertaken and in the subject case the supply is supposed to have been completed on 31.12.2019 as per the impugned Work Order, the questions raised by the applicant cannot be answered, in terms of Section 95 mentioned above.
Conclusion
Question l: How much GST Rate Applicable to Aryan Contractor Private Ltd (Subcontractor), 12% or 18%?Answer: – Not answered in view of discussions made above.
Question2: Which Tariff Head applicable to Aryan Contractor Private Ltd (Subcontractor)?
Answer- Not answered.